Automated Schedule Quality Analysis
Analyze the technical quality of your Primavera P6 schedule (.XER)
Upload your .XER file and get a technical report with findings and charts in ~1 minute
What xerPlanner analyzes
xerPlanner performs 20+ schedule quality checks across logic, constraints, float, relationships and resources.
Logical Relationships
Detect missing predecessors, successors and open-ended activities.
Schedule Constraints
Identifies absolute and window constraints that affect network logic.
Float Analysis
Highlight negative float and excessive float conditions.
Relationship Quality
Analyze lags, leads and calendar inconsistencies between activities.
Resource Assignments
Detect inconsistencies in labor and non-labor resource allocation.
Resource Distribution
Evaluate labor curves to identify peaks, valleys and imbalances.
Understand your schedule in seconds
Each analysis generates a structured technical report including an executive summary, detailed findings, charts and quality scores. All findings include explanations and direct access to detailed guidance.
- Executive summary (AI generated)
- Detailed findings with activity-level data
- Charts and visual indicators
- Excel export for advanced review
Each report includes a QR code to verify authenticity
What you get with the Pro analysis...
Free vs Pro Analysis
Understand what you get with the free analysis and what you unlock with the full version.
| Feature | Free (0 USD) | ⭐ Pro (5 USD) |
|---|---|---|
| Full set of analyses | ✔ | ✔ |
| Technical report | ✔ | ✔ |
| Executive summary | Generic | AI-generated |
| Findings shown | Limited | All findings |
| Labor resource curves analysis | ✖ | ✔ |
| Annexes | ✖ | ✔ |
| Excel export | ✖ | ✔ |
| History | ✖ | ✔ |
Start with the free version and upgrade only if you need full visibility.
Improve your schedule quality
The Value of a Well-Structured Schedule
RSQI: How to Tell If Your Schedule Is Suitable for Forensic Analysis
General Schedule Observations
Practical insights on Primavera P6, scheduling logic and project controls.
